Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A First Prototype of an Active Boring Bar Tested in Industry
Vise andre og tillknytning
Ansvarlig organisasjon
2006 (engelsk)Konferansepaper, Publicerat paper (Annet vitenskapelig) PublishedAlternativ tittel
En första prototyp av en aktiv svarvbom testad i industrin (svensk)
Abstract [en]

Metal cutting is a common process in the manufacturing industry. Vibration problem during metal cutting is a reality for these manufactures. The vibration level depends on many different parameters such as material type, dimensions of the workpiece and boring bar, cutting data and operation mode. Internal cutting is one of the most troublesome operation modes, without any continuous monitoring and control from an operator grave vibration levels quickly arises. From the industry point of view this is an expense in the production line. The reduced tool life and the coarse surface finishing caused by the large vibration will force the operator to stop the cutting process, either to change tool when it is broken or change cutting data like decreasing the cutting depth. Any interference like this increases the working time for each component tremendous. These problems have been located and examined in an industry producing and renovating components using a lathe. One lathe was chosen for further investigation by experimental modal analysis and analysis during operational mode. The examination was done in an environment with machining processes in full operation mode and also during non-working ours. After analyzing the problem different solution where scrutinized and a first prototype where constructed. The solution to the problem is an active boring bar. This paper will present the procedure from analyzing a problem in industry to the test of the first prototype of the solution.

sted, utgiver, år, opplag, sider
Vienna, 2006.
Emneord [en]
Active, Adaptive, Control, Industry
HSV kategori
Identifikatorer
URN: urn:nbn:se:bth-10170Lokal ID: oai:bth.se:forskinfo2B71780AE6E279F6C12571BE00323419OAI: oai:DiVA.org:bth-10170DiVA, id: diva2:838234
Konferanse
Thirteenth International Congress on Sound and Vibration
Tilgjengelig fra: 2012-09-18 Laget: 2006-08-02 Sist oppdatert: 2015-06-30bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Personposter BETA

Håkansson, LarsClaesson, Ingvar

Søk i DiVA

Av forfatter/redaktør
Håkansson, LarsClaesson, Ingvar

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 209 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf