Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Risk-adjusted Earned Value and Earned Duration Management models for project performance forecasting
Blekinge Tekniska Högskola, Fakulteten för teknikvetenskaper, Institutionen för industriell ekonomi.
Blekinge Tekniska Högskola, Fakulteten för teknikvetenskaper, Institutionen för industriell ekonomi.
2019 (Engelska)Självständigt arbete på avancerad nivå (masterexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
Abstract [en]

Project control is essential to ensure that the investment on a project is providing the intended benefits and is valuable to the customers. Previous methods offer project performance monitoring and forecasting tools, but they lack accuracy and the associated techniques omit the project financial risk (any unplanned event that has an impact on schedule and budget); the main factor of project failure. Poor project execution, and particularly failure to control and accurately forecast the project performance, may lead to increased costs, upset customers and eventually loss of market share. These gaps have been filled in this study by the development of novel models that use statistical analysis of the previous project performance, including risk evaluation techniques. The proposed models succeeded in providing remarkably improved forecasts in three project dimensions: duration, cost and resources. The robustness of the models has been verified by testing them on real projects. The results show superiority in terms of accuracy and easy application compared to any existing method, proving that the risk inclusion provides improvement compared to previous studies. The most important features of the models are: risk-based adjustment of the forecasted values, periodic and completion forecasts, statistical processing and holistic approach. The greatest advancements have been made in the cost forecast, for which the risk adjustment inclusion is examined for the first time. The resources (man-hours) forecast is another pioneer element of the proposed models. All the above provide a complete image of the project status and paint the picture of future performance. The models results are fed in a Decision Support System, which highlights the overperforming and underperforming areas of the project. This confirms the proposition that the model results can be used to initiate restorative action. The contribution of this study to the project management field is easy-to-use and accurate models, which include the financial risk and facilitate the project manager’s decisions and actions. Anticipation of the project performance, by considering the risk, can result to significant time and cost savings, crucial for project success.   

Ort, förlag, år, upplaga, sidor
2019. , s. 77
Nyckelord [en]
Project monitoring, Project forecasting, Financial risk, Earned Value Management, Earned Duration Management, Schedule Performance Index, Duration Performance Index, Cost performance Index, Program Performance Index, Risk Coefficient, Risk-adjusted Schedule Model, Risk-adjusted Cost Model, Risk-adjusted Man-hours Model, Statistical Analysis, Decision Support System
Nationell ämneskategori
Övrig annan teknik
Identifikatorer
URN: urn:nbn:se:bth-18965OAI: oai:DiVA.org:bth-18965DiVA, id: diva2:1373119
Ämne / kurs
IY2594 Magisterarbete MBA
Utbildningsprogram
IYABA MBA-programmet
Handledare
Examinatorer
Tillgänglig från: 2019-11-27 Skapad: 2019-11-26 Senast uppdaterad: 2019-11-27Bibliografiskt granskad

Open Access i DiVA

fulltext(1501 kB)71 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 1501 kBChecksumma SHA-512
8a45d34eb7b2b489277f610b52646223c0e8cf21c9144b538640aaf727133cd93524689646fdfbe87f8b5ed18e853649211b95b6b264b4a586a645420d43fb1d
Typ fulltextMimetyp application/pdf

Av organisationen
Institutionen för industriell ekonomi
Övrig annan teknik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 71 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 188 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf