Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Identifiera och reducera slöseri med lean thinking
Blekinge Institute of Technology, Faculty of Engineering, Department of Mechanical Engineering.
2021 (Swedish)Independent thesis Basic level (university diploma), 12 credits / 18 HE creditsStudent thesisAlternative title
Identifiera och reducera slöserimed lean thinking (Swedish)
Abstract [sv]

AGES är ett företag som pressgjuter produkter i aluminium med olika legeringar. De producerar främst till fordons- och verkstadsindustrin. De har i dagsläget låg total utrustningseffektivitet på två av sina maskiner och vill få reda på varför. De största tidsförlusterna är ställtiderna samt att operatörerna inte märker att maskinstopp har skett. 

 

Målet med examensarbetet var att identifiera och reducera slöseri i produktionsprocessen hos AGES och skapa en grund för framtida arbete med SMED och Lean Production.  

 

Genom olika mätningar kunde olika analyser utföras såsom värdeflödesanalys och OEE-analys. Analyserna resulterade i ett antal förbättringsförslag där vissa av dem planeras att implementeras. Vissa hamnade under utvärdering och vissa hamnade som framtida förbättringar. Studien har också bidragit till en ökad förståelse för varför maskinstopp sker och vilka åtgärder som bör vidtas.

Ledningen på AGES är positiva till resultatet av studien och förbättringsförslagen. Inom SMED har det resulterat i en plan till hur verktygsbytet kan gå till för att minska ställtiderna samt hur mycket tid som kan besparas vid implementering. 

Abstract [en]

AGES is a company that die-cast aluminum products with various alloys. They mainly produce for the automotive and engineering industries. Currently they have a low total equipment efficiency on two of their machines and they want to find out why. The biggest time losses are the set-up times and that the operators are not noticing when a machine stop has occurred.

 

The aim of the project was to identify and reduce waste in the production process at AGES and create a basis for future work with SMED and Lean Production. 

 

Through different measurements, different analyzes could be performed such as value flow analysis and OEE-analysis. The analyzes resulted in several improvement proposals, some of which are planned to be implemented. Some will be evaluated and will be implemented as future improvements. The study has also led to an understanding of why machine stops occur and what measures should be taken. 

 

The management at AGES is positive to the results of the study and the improvement proposals. Within SMED, it resulted in a plan for how the tool change can be done to reduce set-up times and how much time can be saved when implemented.

Place, publisher, year, edition, pages
2021. , p. 48
Keywords [sv]
SMED, Ställtid, Lean Production, Overall equipment efficiency
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:bth-21684OAI: oai:DiVA.org:bth-21684DiVA, id: diva2:1567805
External cooperation
AGES
Subject / course
MT1475 Thesis
Educational program
MTGMI Bachelor of Science in Mechanical Engineering
Supervisors
Examiners
Available from: 2021-06-18 Created: 2021-06-16 Last updated: 2022-10-31Bibliographically approved

Open Access in DiVA

fulltext(868 kB)102 downloads
File information
File name FULLTEXT02.pdfFile size 868 kBChecksum SHA-512
69550012065e01b68fa6259dd7d3fa15d07287032e1c8f201196d7461fd2b5e8d9fa22c38745307ef61f7fde340a8a3b7643f0034f16f48005b27e4812d7d2e4
Type fulltextMimetype application/pdf

By organisation
Department of Mechanical Engineering
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 102 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 362 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf