This thesis describes Scrum and with a feasibility study tests if Scrum can be applied in a project with two developers at T-systems Sweden. Key issues regarding the development process are pointed out from a baseline project. The influence of the issues in the project is later tested in the new project at the same organization. New issues were identified and studied and corrected. Interviews and literature study are used to gather information of what issues do occur and may occur. The results and analysis lead to a conclusion on what changes that should be done and what strength and weaknesses Scrum has when implemented at T-systems Sweden.