Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
A Comparison of Cross- versus Single-company Effort Prediction Models for Web Projects
Univ Oulu, Dept Informat Proc Sci, Oulu 90014, Finland..ORCID iD: 0000-0003-1511-2163
Blekinge Institute of Technology, School of Computing. Blekinge Inst Technol, Software Engn Res Lab, Karlskrona, Sweden..ORCID iD: 0000-0003-0449-5322
2014 (English)In: 2014 40TH EUROMICRO CONFERENCE SERIES ON SOFTWARE ENGINEERING AND ADVANCED APPLICATIONS (SEAA 2014), 2014, p. 285-292Conference paper, Published paper (Refereed)
Resource type
Text
Abstract [en]

Background: In order to address the challenges in companies having no or limited effort datasets of their own, cross-company models have been a focus of interest for previous studies. Further, a particular domain of investigation has been Web projects. Aim: This study investigates to what extent effort predictions obtained using cross-company (CC) datasets are effective in relation to the predictions obtained using single-company (SC) datasets within the domain of web projects. Method: This study uses the Tukutuku database. We employed data on 125 projects from eight different companies and built cross and single-company models with stepwise linear regression (SWR) with and without relevancy filtering. We also benchmarked these models against mean and median based models. We report a case-by-case analysis per company as well as a meta-analysis of the findings. Results: Results showed that CC models provided poor predictions and performed significantly worse than SC models. However, relevancy filtered CC models yielded comparable results to that of SC models. These results corroborate with previous research. An interesting result was that the median-based models were consistently better than other models. Conclusions: We conclude that companies that carry out Web development may use a median-based CC model for prediction until it is possible for the company to build its own SC model, which can be used by itself or in combination with median-based estimations.

Place, publisher, year, edition, pages
2014. p. 285-292
Series
EUROMICRO Conference Proceedings, ISSN 1089-6503
Keywords [en]
cross-company effort model, single-company effort model, effort estimation, web projects
National Category
Software Engineering
Identifiers
URN: urn:nbn:se:bth-11468DOI: 10.1109/SEAA.2014.41ISI: 000358153200043ISBN: 978-1-4799-5795-8 (print)OAI: oai:DiVA.org:bth-11468DiVA, id: diva2:899325
Conference
40th Euromicro Conference on Software Engineering and Advanced Applications (SEAA), AUG 27-29, 2014, Univ Verona, Dept Comp Sci, Verona, ITALY
Available from: 2016-02-01 Created: 2016-01-20 Last updated: 2023-12-04Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full text

Authority records

Turhan, BurakMendes, Emilia

Search in DiVA

By author/editor
Turhan, BurakMendes, Emilia
By organisation
School of Computing
Software Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 37 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf