XLPE-cable Production Optimization: Setup time Reduction at Armoring line
Blekinge Tekniska Högskola, Fakulteten för teknikvetenskaper, Institutionen för maskinteknik.
2014 (engelsk)Oppgave
Abstract [en]

At ABB’s high voltage cable factory in Karlskrona, there is a line production that is regarded as a bottleneck. The production rate at this workplace as well as the large variations of setups has created two major problems. The first problem is that it has become difficult for the planning department to determine the lead times for delivery to the customers. The other problem is that the long setup times has made this line production the bottleneck of the whole production. The factory at ABB HVC includes a number of line productions, where each line has their own purpose and value adding processes. The armoring line AR50 that this project has the focus to improve has the last value adding processes for the factory’s main product. The factory’s main product is the Cross-Linked Polyethylene cable, shortened XLPE. There are several different advantages with the XLPE-cable system. First of all they are maintenance-free and environmentally friendly. The main reason that the XLPE-cable is environmentally friendly is because it have low electrical losses. Since the submarine cables are underground the cables are invisible and not effected by weather conditions. This project implements the method SMED as well as various methods from the LEAN transcript in order to reduce the setup times and create a more stable and effficient production. An Ishikawa diagram were used in order to determine the root causes of the problems. Later both technical and management solutions were proposed and implemented. The project has concluded impressive results regarding setup time reduction and annual cost savings. It also enlightens the large potential for further improvement. This project will be continued during the year of 2014 in order to implement the proposed solutions. The future improvements are not just technical but also related to management and group dynamics.

sted, utgiver, år, opplag, sider
2014. , s. 71
Emneord [en]
Lead-time, Setup time, SMED, LEAN, Ishikawa diagram, Continous improvement
HSV kategori
Identifikatorer
URN: urn:nbn:se:bth-5240Lokal ID: oai:bth.se:arkivex134372CB3226225FC1257CF4006B3722OAI: oai:DiVA.org:bth-5240DiVA, id: diva2:832609
Utdanningsprogram
IEACI Master of Science in Industrial Management and Engineering
Uppsök
Technology
Veileder
Tilgjengelig fra: 2015-04-22 Laget: 2014-06-11 Sist oppdatert: 2025-09-30bibliografisk kontrollert

Open Access i DiVA

fulltekst(246 kB)1299 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 246 kBChecksum SHA-512
388491e98bb873e1f430fd8a9b9f70958e1cc61b7a93d9e0aa7cd4cc81ab2e29006f6510c5c34bc4df543d667119ddca3fe6a84cfd99580e5840ba8b506cc9a9
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1299 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1505 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf