Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
XLPE-cable Production Optimization: Setup time Reduction at Armoring line
Blekinge Tekniska Högskola, Fakulteten för teknikvetenskaper, Institutionen för maskinteknik.
2014 (Engelska)Studentuppsats (Examensarbete)
Abstract [en]

At ABB’s high voltage cable factory in Karlskrona, there is a line production that is regarded as a bottleneck. The production rate at this workplace as well as the large variations of setups has created two major problems. The first problem is that it has become difficult for the planning department to determine the lead times for delivery to the customers. The other problem is that the long setup times has made this line production the bottleneck of the whole production. The factory at ABB HVC includes a number of line productions, where each line has their own purpose and value adding processes. The armoring line AR50 that this project has the focus to improve has the last value adding processes for the factory’s main product. The factory’s main product is the Cross-Linked Polyethylene cable, shortened XLPE. There are several different advantages with the XLPE-cable system. First of all they are maintenance-free and environmentally friendly. The main reason that the XLPE-cable is environmentally friendly is because it have low electrical losses. Since the submarine cables are underground the cables are invisible and not effected by weather conditions. This project implements the method SMED as well as various methods from the LEAN transcript in order to reduce the setup times and create a more stable and effficient production. An Ishikawa diagram were used in order to determine the root causes of the problems. Later both technical and management solutions were proposed and implemented. The project has concluded impressive results regarding setup time reduction and annual cost savings. It also enlightens the large potential for further improvement. This project will be continued during the year of 2014 in order to implement the proposed solutions. The future improvements are not just technical but also related to management and group dynamics.

Ort, förlag, år, upplaga, sidor
2014. , s. 71
Nyckelord [en]
Lead-time, Setup time, SMED, LEAN, Ishikawa diagram, Continous improvement
Nationell ämneskategori
Maskinteknik Annan maskinteknik
Identifikatorer
URN: urn:nbn:se:bth-5240Lokalt ID: oai:bth.se:arkivex134372CB3226225FC1257CF4006B3722OAI: oai:DiVA.org:bth-5240DiVA, id: diva2:832609
Utbildningsprogram
IEACI Civilingenjör i industriell ekonomi
Uppsök
teknik
Handledare
Tillgänglig från: 2015-04-22 Skapad: 2014-06-11 Senast uppdaterad: 2025-09-30Bibliografiskt granskad

Open Access i DiVA

fulltext(246 kB)1299 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 246 kBChecksumma SHA-512
388491e98bb873e1f430fd8a9b9f70958e1cc61b7a93d9e0aa7cd4cc81ab2e29006f6510c5c34bc4df543d667119ddca3fe6a84cfd99580e5840ba8b506cc9a9
Typ fulltextMimetyp application/pdf

Av organisationen
Institutionen för maskinteknik
MaskinteknikAnnan maskinteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 1299 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 1505 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf